Bryant Wastewater System Improvements & CAO Closure

Dates: Sep 11, 2026 – Dec 31, 2028

A Decade of Progress. A Stronger Foundation for the Future.

The City of Bryant has officially been released from its Consent Administrative Order (CAO), marking a significant milestone in the City's ongoing efforts to improve its wastewater system, strengthen infrastructure, and meet environmental requirements.

The CAO, which took effect in 2016, established a formal process for addressing identified wastewater system issues through corrective actions, infrastructure improvements, and established compliance milestones. Over the years, the City has worked with engineering professionals and regulatory agencies while continuing to invest in the equipment, facilities, and maintenance practices needed to support a reliable wastewater system.

Release from the CAO marks the completion of an important regulatory chapter. It does not mean the City's wastewater infrastructure work is finished. Bryant continues to plan and advance improvements that address system capacity, strengthen reliability, resolve existing limitations, and prepare for future growth.

Understanding Bryant's Consent Administrative Order

A Consent Administrative Order (CAO) is a formal regulatory agreement that establishes requirements and timelines for addressing environmental or operational violations. In wastewater systems, these orders may include corrective actions, infrastructure improvements, operational changes, and reporting requirements designed to bring a system into compliance.

How It Started

On November 6, 2015, the Arkansas Department of Environmental Quality (ADEQ) issued a proposed Consent Administrative Order to the City of Bryant following multiple sanitary sewer overflow violations.

During the process, the City requested that the proposed order be withdrawn and that the assessed civil penalty be reduced. ADEQ declined to withdraw the order but agreed to reduce the penalty from $6,000 to $4,500.

The final order, identified as LIS 16-057, was signed by the agency director on July 14, 2016, and became effective approximately August 25, 2016. The City paid the $4,500 civil penalty associated with the order.

The CAO established a corrective action process requiring the City to develop a comprehensive plan, establish milestones, and work toward addressing the violations identified in the order.

A Decade of Progress

Bryant's work to improve its wastewater system predates the CAO. In its September 2016 Corrective Action Plan, the City documented approximately $9.3 million in wastewater-related capital projects, equipment, engineering, and other activities completed or undertaken since 2008. Those efforts included sewer rehabilitation, pump station improvements, treatment plant upgrades, system monitoring, and maintenance initiatives.

The City continued evaluating and improving its collection system under the corrective action process. In July 2017, ADEQ conducted an inspection of Bryant's wastewater collection system. The inspection received an overall satisfactory rating, and no violations were noted at the time of the inspection.

Over the years, the City has continued its work through infrastructure improvements, engineering, operational oversight, and long-term utility planning. The City's release from the CAO marks an important milestone in that ongoing effort and reflects the completion of the requirements associated with the order.

Moving Forward

The City's responsibility to maintain a reliable wastewater system continues beyond the closure of the CAO. Bryant is advancing additional infrastructure projects focused on increasing capacity, improving system performance, and supporting responsible growth.

These projects are part of the City's broader, long-term approach to wastewater management: addressing current needs, planning for future demands, and continuing to invest in the infrastructure residents depend on every day.

Project Updates

In-House Sewer Line Rehabilitation: Pipe Bursting

DATE: Nov 09, 2026

Project Timeline: Ongoing

The City of Bryant's Public Works Department has expanded its ability to rehabilitate aging sewer lines using an in-house pipe bursting program. This trenchless method allows crews to replace existing sewer lines with new pipe while minimizing the need for extensive excavation. 

By performing this work with City crews, Bryant can take a more proactive approach to sewer maintenance and rehabilitation while reducing its reliance on outside contractors. In 2025, City crews completed approximately 3,500 feet of sewer line pipe bursting. 

Funding: City wastewater utility funds and operational resources.

Current Status: Ongoing. Public Works crews continue identifying and rehabilitating sewer lines throughout the collection system as part of the City's wastewater maintenance program.

Lea Circle Parallel Gravity Sewer Project

DATE: Nov 09, 2026

Project Timeline: Completed 2025

The Lea Circle Parallel Gravity Sewer Project involved the installation of a new 24-inch parallel gravity sewer main to improve capacity and support the long-term reliability of Bryant's wastewater collection system. 

The project was funded through the Clean Water State Revolving Fund program and represents a significant investment in the City's sewer infrastructure. 

Funding: Clean Water State Revolving Fund 

Current Status: Construction completed in 2025.

Supplemental Alkalinity Feed

DATE: Nov 09, 2026

Project Timeline: To Be Determined - Contingency Improvement

Supplemental alkalinity is a potential operational improvement identified in the City's Wastewater Master Plan and Capital Improvement Plan. 

Alkalinity helps support stable nitrification, an important biological process in wastewater treatment that contributes to reliable ammonia removal. Depending on wastewater characteristics and treatment conditions, additional alkalinity may be necessary to maintain consistent treatment performance. 

The City is currently evaluating operational data and ammonia performance to determine whether this improvement is necessary. 

Funding: Utility savings and budgeted funds, if implementation becomes necessary.

Current Status: Study and evaluation phase. No construction has been established. Implementation will depend on the findings of the study and actual operating conditions.

Springhill Gravity Main Project

DATE: Nov 09, 2026

Anticipated Completion: Third Quarter 2027

The Springhill Gravity Main Project will construct a new gravity sewer main to improve wastewater system capacity and support future development within the Springhill service area. 

McClelland Engineering has completed 100% of the design, and all plans have received approval. Developers are coordinating the remaining easements and exploring potential cost-sharing arrangements. 

Funding: Planned funding sources include utility reserves, impact fees, budgeted capital funds, and potential developer cost-sharing. 

Current Status: Engineering is complete and approved. Remaining easements and potential cost-sharing arrangements are being coordinated.

Lift Station 5 Force Main

DATE: Nov 09, 2026

Anticipated Completion: First Quarter 2028

A new force main is planned to accommodate the increased pumping capacity of Lift Station 5 and address existing restrictions in the force main system. 

Hawkins-Weir Engineers has completed approximately 80% of the design. Plans are nearing submission for state agency review and approval. Easement acquisition is also underway. 

Funding: Engineering is funded through Bryant ARPA funds. The City is applying for an Arkansas Water and Sewer Treatment Facilities Grant to assist with project funding. Alternative funding options include the State Revolving Fund or Rural Water financing. 

Current Status: Design is nearing completion, and easement acquisition is underway.

Lift Station 5 Improvements

DATE: Nov 09, 2026

Anticipated Completion: Second Quarter 2028

Lift Station 5 improvements are designed to increase pumping capacity and address the chronic sanitary sewer overflows historically associated with the station. The last chronic sanitary sewer overflow associated with Lift Station 5 occurred in 2021. 

Hawkins-Weir Engineers has completed approximately 60% of the design plans. The City is finalizing design preferences and project-specific details before advancing the plan. 

Funding: Bryant allocated $1.1 million in American Rescue Plan Act (ARPA) funds toward project initiation and engineering. Construction funding is expected to be pursued through a Rural Water loan, with the State Revolving Fund (SRF) as an alternative. The City's adopted utility rate study includes debt service associated with planned infrastructure investments. 

Current Status: Design development and project details are being finalized.